The following is a profile of the steps taken in most of our design development, and represents our guidelines for work to be performed in a typical project. Some projects don't require this extent of work; some require extras not outlined here.
- Preliminary meetings with principals to discuss desired objectives, type of service, cost budget and method of operation proposed.
- Prepare preliminary drawings, correlating areas with room spaces and locations of equipment items. At this time, if necessary, a report is made of facilities and requirements, along with a Cost Estimate.
- Assemble catalog sheets into binders for Owner, Architect and Engineers.
- A Floor Plan, indicating mechanical and electrical requirements is produced for the Engineers, indicating plumbing connections and sizes, air removal requirements and electrical loads and connections to equipment.
- A Plan is provided indicating conditions in the Food Service Areas, such as raised equipment bases, slab depressions, wall locations, doors and special wall openings.
- A Final Floor Plan, indicating arrangements of equipment and a schedule of items, showing mechanical, electrical and special connections is provided.
- Detailed drawings, specifications and elevations accurately detail all required information giving Contractors maximum knowledge of the project.
- Completed original drawings and specifications are turned over to the Owner or Architect for bidding.
- Assistance in analyzing the Bids received, to approve or reject any proposals, proposed equals or bidding firms. Check submittals of Shop Drawings.